Responsible for all shell work, rebar, concrete work, forming and masonry, CCSI delivered this job 20% ahead of schedule despite the difficulties involved with a parking structure with specifications calling for non typical building sides.

CCSI achieved this by starting the foundation for the building and garage simultaneously and maximizing the use of crane equipment, materials and manpower.

PROJECT SPECIFICATIONS:
Condo Hotel
Concrete: 6,375 cubic yards
Concrete Blocks: 67,500
Reinforced Steel: 337 tons
Post Tension Cable: 45 tons